Socket - Belton, Micalex, 8 Pin, Octal PC Mount, Long Lead
Belton 8-pin Micalex PC mount tube socket with long leads commonly used for octal based power, preamp, and rectifier tubes. Applicable for use with all types of electronic equipment using vacuum tubes.
- Convenient top or bottom mount capabilities
- 1-1/4” chassis hole required
- 1-1/2” oblong mounting centers
Features:
- Paddle saddle mounting
- Easy mount with the saddle of extruded screw hole
- Phosphorous bronze pin terminal with tin plating
- Glassfiber filled PPS Insulating material
- Long leads
RoHS Compliant
Body Diameter | 30 mm | |
Body Height | 14.5 mm | |
Item Height | 22.8 mm | |
Item Length | 50 mm | |
Item Width | 34 mm | |
Mounting Hole Center to Center | 40 mm | |
Mounting Hole Width | 3.5 mm |
Packaging Dimensions | 2 in. × 1.4 in. × 1.4 in. | |
Weight (Packaging) | 0.037 lbs. |
![]() | All Models |
My Project Lists
Specifications, Files, and Documents
Questions and Answers
No questions have been asked about this product.
Product Reviews